Here's a look at the progress of our house! From beginning (12/2017) to end (08/2018). It felt like eternity, I'm not going to lie... but I don't think I'd change anything about what we went through to get here. Enjoy the pictures!
Before: (December 2017)
Still nothing: (early March 2018)
Breaking ground: (mid-March 2018)
Slow but steady progress: (mid-March through end of May)
The "driveway"
Basement is laid out
A view to the back of the lot
Concrete footers are poured
These frames are put in so the concrete walls can be poured
Concrete!
We have basement walls! These had to sit for 7-10 days.
The dirt mound in the front is gone! (the garages were filled with the dirt)
Plumbing in the basement.
The concrete for the basement and garages was poured.
Wood delivery: (late May)
Framing: (late May-June)
Basement framing:
First story framing:
Framing out the 3rd car garage: (early June)
The start of the roof shingles: (early June)
Lots going on this week! Continuation of shingles/HVAC/Plumbing/Electrical done/Installation of tubs/Building the deck: (2nd week of June)
Installation of the windows/doors; electrical/low-voltage installed; bricks delivered; pre-dry wall inspections done: (mid-June)
Brick was delivered (mid-June):
Siding and cedar shake were put up (3rd week of June):
Pre-drywall inspection with construction manager (3rd week of June):
Brick installation has begun (late-June):
Sewer lines are installed (first of July):
Drywall is up! (first week of July):
Sydney's room
Taylor's room
Parker's room
We have a driveway!
Sidewalks being poured
Installation of the countertops (both kitchen and bath), hardwood floors, garage doors, shutters, delivery of the columns, beginning of grading of the yard (First week of August):
Shutters! They make it look so much more homey.
Countertops!
Hardwoods
Bathroom countertops!
Grading of the yard
Column delivery (finally- they had ordered the wrong ones originally!)
LOTS going on this week! Columns are installed, plumber installed all faucets, hot water heater, & toilets, landscaping, carpet, mirrors, shelving units, gutters and blinds are installed. (Second week of August):
What a difference sod makes! (Columns, too!)
landscaping
carpet!
Master bath
Sydney's bath
The pantry! I am SO excited about this!! This is nothing crazy grand by any means, but our last pantry was pathetic! (and we didn't even have a pantry in our apartment)
Gettin' there...
Blinds
Yay, we don't have to jump down from the porch anymore!
Nor do we have to jump up into the house. ;)
Basement stair rail went in.
We have AC!
They put brick around the columns. They had to take down the railings they had so awesomely put up to do this. :(
Staining the stairs!
Painting the garage.
Building the bookshelves.
Stove installed.
A view of the put-back porch railings.
Wrapping everything up... it's getting real! Walkthroughs, final touch-ups, etc. (third week of August)
I kept asking- when are you painting the railings? Guess what? They don't. What?? (They say the wood is the same as the deck wood, and should remain unstained/unpainted for 3-6 months). Boo.
The cleaners came! This was my first look of our real, put-together house!
Guest bath.
Kitchen
Foyer
Master bath
Master bath
Upstairs
Living room
It feels SOOOOOOOO good to be in our own space, out of the apartment, with all of our stuff in our house. OUR house. Ahhhhh. All these months... it was all definitely worth it, but I know I'll believe that even more once all of these boxes are emptied and things are in place. :)
Next, I'll have to post pictures of the aftermath, with all our stuff in it! I can tell you it hasn't looked this clean since... ;)