Tuesday, September 18, 2018

House Progress

Here's a look at the progress of our house!  From beginning (12/2017) to end  (08/2018).  It felt like eternity, I'm not going to lie... but I don't think I'd change anything about what we went through to get here.  Enjoy the pictures!

Before: (December 2017)




Still nothing: (early March 2018)


Breaking ground: (mid-March 2018)



Slow but steady progress: (mid-March through end of May)

The "driveway"

Basement is laid out

A view to the back of the lot

Concrete footers are poured

These frames are put in so the concrete walls can be poured

Concrete!

We have basement walls!  These had to sit for 7-10 days.


The dirt mound in the front is gone! (the garages were filled with the dirt)

Plumbing in the basement.



The concrete for the basement and garages was poured.




Wood delivery: (late May)




Framing: (late May-June)

Basement framing:



First story framing:








Second story framing:





 Trusses/Roof framing: (early June)





Framing out the 3rd car garage: (early June)




Finishing up the roof framing/preparing for shingles; installation of the fire place; framing out inside things (island, bookshelves, frame around the showers/tubs): (early June)





The start of the roof shingles: (early June)


Lots going on this week!  Continuation of shingles/HVAC/Plumbing/Electrical done/Installation of tubs/Building the deck: (2nd week of June)






Installation of the windows/doors; electrical/low-voltage installed; bricks delivered; pre-dry wall inspections done: (mid-June)





Brick was delivered (mid-June):


Siding and cedar shake were put up (3rd week of June):



Pre-drywall inspection with construction manager (3rd week of June):


Brick installation has begun (late-June):




Brick installation is complete.  Meanwhile, construction manager leaves the company, leaving only one construction manager for the n'hood.  The insulation and dry-wall installation are stalled for 2 weeks.  Ugh. (end of June):


Sewer lines are installed (first of July):


Drywall is up! (first week of July):

Sydney's room

Taylor's room

Parker's room





Fireplace installed, doors installed, trim is done, driveway and sidewalks are poured!! (Third week of July):



We have a driveway!

Sidewalks being poured




Inside painting has happened, mud area is built, French doors are installed, wooden stairs and railing are installed, chair rail is done in dining room, tile work is mostly done, outside of the house is painted! (Fourth week of July):








Cabinets installed, lighting/fixtures are installed, tiling in master shower is done! (End of July):













Installation of the countertops (both kitchen and bath), hardwood floors, garage doors, shutters, delivery of the columns, beginning of grading of the yard (First week of August):

Shutters!  They make it look so much more homey.

Countertops!

Hardwoods


Bathroom countertops!


Grading of the yard


Column delivery (finally- they had ordered the wrong ones originally!)

LOTS going on this week! Columns are installed, plumber installed all faucets, hot water heater, & toilets, landscaping, carpet, mirrors, shelving units, gutters and blinds are installed. (Second week of August):





What a difference sod makes! (Columns, too!)

landscaping

carpet!

Master bath

Sydney's bath

The pantry!  I am SO excited about this!!  This is nothing crazy grand by any means, but our last pantry was pathetic! (and we didn't even have a pantry in our apartment)

Gettin' there...

Blinds

Yay, we don't have to jump down from the porch anymore!

Nor do we have to jump up into the house. ;)

Basement stair rail went in.

We have AC!

They put brick around the columns.  They had to take down the railings they had so awesomely put up to do this.  :(

Staining the stairs!

Painting the garage.

Building the bookshelves.

Stove installed.

A view of the put-back porch railings.

Wrapping everything up... it's getting real! Walkthroughs, final touch-ups, etc. (third week of August)



I kept asking- when are you painting the railings?  Guess what?  They don't.  What?? (They say the wood is the same as the deck wood, and should remain unstained/unpainted for 3-6 months).  Boo.

The cleaners came!  This was my first look of our real, put-together house!

Guest bath.

Kitchen

Foyer

Master bath

Master bath

Upstairs

Living room


 We closed on Friday, August 24th!  It didn't come drama-free, as 24 hours before closing, we were told our neighbors' fence is 2 feet onto our property.  They realized this on August 23rd.  Luckily, I work for a closing attorney and I made a call, he gave me a solution that didn't involve them having to tear down their fence, and we were in business!

It feels SOOOOOOOO good to be in our own space, out of the apartment, with all of our stuff in our house.  OUR house.  Ahhhhh.  All these months... it was all definitely worth it, but I know I'll believe that even more once all of these boxes are emptied and things are in place. :)

Next, I'll have to post pictures of the aftermath, with all our stuff in it!  I can tell you it hasn't looked this clean since... ;)